
MUSÉE DES SCEAUX (92)
Renovation of a museum in the Paris region to manage the temperature and humidity in several rooms.

BURGER KING (33)
Installation of two ETT rooftops in a new building with regulation of the supply temperature and compensation of fresh air from the extraction hoods for the kitchen...

GALERIE CARREFOUR SARAN (45)
Adapting to the existing situation by proposing an innovative technical and economic solution.

AIRBUS
ETT has been working with aircraft manufacturers on FAL (Finaly Assemblage Line) and Runway applications since 2002.

DASSAULT (33)
Our manufacturing flexibility means we can develop bespoke products to meet the constraints of this military application.

DASSAULT (33)
Our manufacturing flexibility means we can develop bespoke products to meet the constraints of this military application.