LEROY MERLIN (74)

Adapting to existing buildings by proposing a technical and economic solution that consumes less energy, with a view to reducing carbon emissions.

Commercial cateringAnnemasse 74
Customer
Leroy Merlin
The issue

Validate the overload, adapt to the existing curbs (adaptor curbs). Structural study.

Our intervention

Define the correspondence between the existing machines (cold and hot power, air flow, changes in the shop and the customer’s new requirements) and the new solution. Comparison of weight and dimensions, feasibility of an adaptor curb. 10-year total warranty with 9 technical maintenance audits, myETTvision, PED.

Key fact

Adaptation to the existing structure (adaptor curbs) without waterproofing the roof.

4
Machines
10
Year warranty

The challenge for ETT

Adapting to the existing situation (replacing existing gas-powered machines) in order to make energy savings, ensure the comfort of employees and customers in summer and winter, and decarbonise. Eliminate gas energy through thermodynamic operation. Designing and creating adaptor curbs to fit the customer's existing curbs, so that the new machines can be installed in place of the existing machines without waterproofing the roof.

Our approach

Identify the customer's needs (energy savings, decarbonisation), visit the site to check the environment, the areas being treated and the existing equipment to be replaced.

Propose a solution that meets needs and constraints.