
UBIPHARM PLANETPHARMA
Installation of machines for Ubipharm Planetpharma

MUSÉE DES SCEAUX (92)
Renovation of a museum in the Paris region to manage the temperature and humidity in several rooms.

DÉCATHLON (63)
Reducing energy consumption through more efficient equipment.

LEROY MERLIN (74)
Adapting to existing buildings by proposing a technical and economic solution that consumes less energy, with a view to reducing carbon emissions.

GALERIE CARREFOUR SARAN (45)
Adapting to the existing situation by proposing an innovative technical and economic solution.

AIRBUS
ETT has been working with aircraft manufacturers on FAL (Finaly Assemblage Line) and Runway applications since 2002.

DASSAULT (33)
Our manufacturing flexibility means we can develop bespoke products to meet the constraints of this military application.

DASSAULT (33)
Our manufacturing flexibility means we can develop bespoke products to meet the constraints of this military application.

BURGER KING (33)
Installation of two ETT rooftops in a new building with regulation of the supply temperature and compensation of fresh air from the extraction hoods for the kitchen...

SCHNEIDER ELECTRIC (38)
This is a large-scale project involving the complete renovation of existing ETT machines dating from 1999 and running on R22.

JOHN COCKERILL (68)
This Gigafactory is Europe’s first manufacturing plant entirely dedicated to low-carbon hydrogen, with an annual electrolyser production capacity of up to 1...

L'OREAL (03)
As part of their equipment renovation, the aim was to deal with a sensitive room for weighing raw materials.