JOHN COCKERILL (68)
This Gigafactory is Europe’s first manufacturing plant entirely dedicated to low-carbon hydrogen, with an annual electrolyser production capacity of up to 1...

BURGER KING (33)
Installation of two ETT rooftops in a new building with regulation of the supply temperature and compensation of fresh air from the extraction hoods for the kitchen...

L'OREAL (03)
As part of their equipment renovation, the aim was to deal with a sensitive room for weighing raw materials.

SPEM (44)
SPEM in Montoir-de-Bretagne, a subsidiary of the ENGIE Group, produces electricity equivalent to the consumption of 450,000 homes. The site produces electricity...

PATHE (69)
To reduce operating costs and stop using Lyon’s groundwater, our client asked us to find a 4-damper rooftop solution.

NEXEREN (63)
This data centre was looking for an innovative air treatment system that would prevent the introduction of any fresh air to avoid any external pollution.

LE TELEGRAMME (29)
Le Télégramme has commissioned a new web press to make its printing plant one of the most modern in Europe. The result is a significant improvement in print...

IMPRIMERIE FRANCE (971)
For the creation of this new printing line, the requirement was to maintain 26°C during the production period and 28°C the rest of the time.

HALLE AUX FLEURS (94)
Modernisation of the original 22,000 m² building, which was an empty hall where wholesalers set up on trestles with their goods.

ELIS (77)
In a context of decarbonization, the world leader in industrial laundry aimed to explore a new concept for a linen dryer.

DOORTAL (01)
As part of the construction of a new production building, the Company needed an efficient and innovative air handling system.

PUSTERLA (87)
The project involved extending the production plant for top-of-the-range packaging, for which heating and air conditioning were essential. Hygrometry management was...